Blog

Projects

Our successful projects tell our story. Since our establishment, our goal has been to make the impossible possible. Hiring qualified, well-trained teams and creating effective partnerships with suppliers from all over the world. 

In collaboration with Iraq General Company for Execution of Irrigation Projects, we have significantly enhanced water resource management. With our experienced teams of professionals and strong supply capabilities, we have enabled the transportation of water to various areas in Basra and Al-Badaa through advanced pumping stations and extensive pipeline networks.

Our initiatives have positioned us at the forefront of overcoming the shortage of clean and reliable water resources

Al Basra Water pipeline Project (DN 2000)
Al Basra Water pipeline Project (DN 2000)

Al Basra Water pipeline Project (DN 2000)

Situated in Al-Badaa- Basra, Iraq , this project involves the supply of ductile iron pipes for a 2000 mm transmission line extending over 110 km. The system is equipped with all essential valves and accessories to ensure optimal operational performance.

Al Basra Water pipeline Project (DN 2000)
Al Basra Water pipeline Project (DN 2000)

Al Samawa Great Pumping Station Project

Located in Al Samawa, this project showcases a fully integrated pumping facility with a design capacity of 2,700 m³/h. It comprises six high-efficiency pumps, complemented by a comprehensive arrangement of pipes, valves, and associated fittings. Additionally, the station is equipped with the requisite electrical and mechanical systems to ensure optimal operational performance.

Al Basra Water pipeline Project (DN 2000)
Al Basra Water pipeline Project (DN 2000)

Floating Station and PS1 Station Project - Phase One

This project covers the supply and installation of a high-capacity pumping station with a flow rate of 5,400 m³/h. It includes 20 pumps with complete piping, fittings, and valves, supported by advanced electrical systems for reliable performance. The other  station also features eight floating pumps including mechanical equipment and integrated into a modern control system for efficient monitoring and operation.

Al Basra Water pipeline Project (DN 2000)
Al Basra Water pipeline Project (DN 2000)

Al Samawa Great Pipeline Project (DN 1400)

This project involves the supply of ductile iron pipes for a 1400 mm transmission line extending over 32 km. The system includes all essential valves, fittings, and flow meters, ensuring reliable performance and seamless water transmission across the network.

Al Basra Water pipeline Project (DN 2000)
Al Basra Water pipeline Project (DN 2000)

Al Basra Pumping Station Project (PS4) - First Precedence

Delivered as a fully integrated facility, the Al Basra Pumping Station (PS4) boasts a capacity of 3,600 m³/h. The station is equipped with 19 high-performance pumps, complete with all required piping, valves, and accessories to ensure efficient operation. It also incorporates advanced electrical systems, surge tanks, and a state-of-the-art control system designed to optimize water distribution and operational reliability.